Skip to main content

We are expanding and building for the future.
New electronics production facility and parking garage.

  • New electronics manufacturing facility enables significant increase in production capacity of electronic parts and components
  • The Building size 5,500 m² includes 3,500 m² for a new electronics manufacturing facility and 2,000 m² for a warehouse and logistics area
  • Investments in the machinery of the electronics production in new and state-of-the-art machines and equipment
  • Highly efficient production line for extremely precise production of electronic parts and components
  • High-quality in-house production and made in Germany
  • Full delivery capability thanks to flexible warehousing - even short-term requirements are assured
  • Clear commitment to the production location Rothenburg o.d.T., Germany 
  • Creation of new jobs
  • New multi-storey parking lot secures long-term parking requirements for the Neuberger workforce
  • Best prepared for future market requirements
     
Sustainable and resource -efficient
  • Sustainable, efficient and state-of-the-art operation of the new manufacturing and logistics center
  • Heating and cooling via concrete core activation (with two reversible heat pumps)
  • Photovoltaic system with a peak output of 400 kWp
  • E-charging columns with connected load management
  • Storage and use of rainwater via cisterns
  • Optimal integration of the buildings into the existing infrastructure

New building.
Electronics production.

Final spurt in the construction of our new electronics production facility. A short time-lapse video shows the installation of the logo on the building facade.

Camera 1
Parking lot

09.12.2024 08:00 Uhr

Camera 2
Electronic manufacturing building

09.12.2024 07:59 Uhr