We are expanding and building for the future. New electronics production facility and parking garage.
New electronics manufacturing facility enables significant increase in production capacity of electronic parts and components
The Building size 5,500 m² includes 3,500 m² for a new electronics manufacturing facility and 2,000 m² for a warehouse and logistics area
Investments in the machinery of the electronics production in new and state-of-the-art machines and equipment
Highly efficient production line for extremely precise production of electronic parts and components
High-quality in-house production and made in Germany
Full delivery capability thanks to flexible warehousing - even short-term requirements are assured
Clear commitment to the production location Rothenburg o.d.T., Germany
Creation of new jobs
New multi-storey parking lot secures long-term parking requirements for the Neuberger workforce
Best prepared for future market requirements
Sustainable and resource -efficient
Sustainable, efficient and state-of-the-art operation of the new manufacturing and logistics center
Heating and cooling via concrete core activation (with two reversible heat pumps)
Photovoltaic system with a peak output of 400 kWp
E-charging columns with connected load management
Storage and use of rainwater via cisterns
Optimal integration of the buildings into the existing infrastructure
New building. Electronics production.
Final spurt in the construction of our new electronics production facility. A short time-lapse video shows the installation of the logo on the building facade.